ASHRAE Level 1-2 Audits

Structured walkthrough audits for small commercial buildings with prioritized measures and clear boundaries.

Fit and next step

Use this scope when it helps the next decision.

The quote request can start with the service selected. Files are still optional at intake.

When this is useful

  • A non-industrial building needs a practical audit or compliance support scope.
  • The work needs priorities, not an oversized study.
  • Operations, retrofit planning, or documentation needs a clearer starting point.

What you receive

  • A staged list of findings, measures, or documentation needs.
  • Assumptions and boundaries suitable for business planning.
  • Next-step recommendations that keep the scope proportionate.

For a small non-industrial commercial building, an audit should turn observations and available operating information into a usable sequence. The scope is agreed around a Level 1- or Level 2-style depth so a walkthrough, analysis, and any recommended further study are not blurred together.

The aim is a decision document: what can be acted on now, what needs more evidence, and which assumptions could change the order.

A good fit when

  • operating schedules or controls need a structured review
  • envelope, ventilation, or equipment questions overlap
  • a capital plan needs a first-pass priority order
  • the team needs to separate practical measures from deeper-study items

What the scope can include

  • available utility and operating-information review
  • a building walkthrough focused on the agreed systems and envelope areas
  • observations about scheduling, controls, and maintenance opportunities
  • planning-level measure comparison with assumptions and dependencies stated

What you receive

  • a prioritized measures list
  • implementation and sequencing notes
  • a separate list of items that need detailed study or design
  • clear assumptions, exclusions, and information gaps

What to prepare

Provide the building use, approximate operating schedule, known concerns, available utility records, equipment information, and access constraints. Name the decision window and budget context if they are already defined.

Boundaries

This is not an investment-grade study, detailed engineering design, tender package, or savings guarantee unless those items are explicitly added under a qualified scope. Actual performance depends on operation, installation, weather, and later design decisions.

Next step

Request a quote with the building type, size context, primary concern, and desired decision. We will confirm the appropriate audit depth and the records worth gathering before a visit.

Related resources

Short reads that help frame the scope.

These links stay close to the topic so the next conversation starts with context, not blank paper.

Start with the right route

Start a conversation, request a quote, or prepare to share drawings.

Mark drawings as ready in the intake. After it is saved, use the private upload control if offered; otherwise follow-up will coordinate the handoff.