For builders

Builders

Coordinate mid-construction inspections, airtightness planning, modelling, and documentation support across Alberta.

Kates Energy supports Alberta builders with Part 9.36 energy modelling, F280 heating and cooling load calculations, and blower-door or diagnostic testing. Start with the permit, mechanical-sizing, or envelope question that needs an answer.

Share the project location, design or construction stage, and intended milestone. We confirm the inputs and deliverables before the work starts; current drawings can follow through the agreed file handoff.

Common scopes

Part 9.36 energy modelling

  • modelling and documentation for the selected energy-code pathway
  • review of supplied drawings, specifications, and design assumptions
  • a record of inputs and open items for the submission team

See Code Compliance Support. The authority having jurisdiction confirms permit expectations and acceptance.

F280 heating and cooling loads

  • review of building geometry, assemblies, windows, and design conditions
  • load calculations for the agreed building boundary
  • an assumptions and information-gap summary for equipment-sizing discussions

See CSA F280 Heat Loss and Peak Load. Equipment selection and final system design remain with the responsible professional or trade.

Mid-construction inspections

  • air barrier continuity risks
  • insulation alignment and transitions
  • leakage details at common trade handoffs

See Envelope Mid-Construction Inspections and the mid-construction checks guide.

Airtightness planning and testing

  • early target setting
  • diagnostic testing where appropriate
  • follow-up strategy when results miss target

Start with Airtightness Testing when measurement or diagnostic context is the next requirement.

Modelling and pathway comparisons

  • envelope and mechanical tradeoffs
  • window and shading decisions
  • parametric options for comfort, cost, and energy goals

Review Energy Modelling and Upgrade Pathways or the code pathway guide.

Compliance and label support

  • documentation support for the selected pathway
  • readiness work for EnerGuide, ENERGY STAR, and Built Green workflows
  • clear assumptions for the file

Use the label-readiness checklist to identify documentation hold points.

When to engage

  • Planning: confirm the scope before details get locked in
  • Construction: catch continuity issues before finishes
  • Closeout: make sure the paperwork matches the building

Request a quote if you want a practical scope rather than a broad package.

Start with the right route

Start a conversation, request a quote, or prepare to share drawings.

Mark drawings as ready in the intake. After it is saved, use the private upload control if offered; otherwise follow-up will coordinate the handoff.