For builders
Builders
Coordinate mid-construction inspections, airtightness planning, modelling, and documentation support across Alberta.
Kates Energy supports Alberta builders with Part 9.36 energy modelling, F280 heating and cooling load calculations, and blower-door or diagnostic testing. Start with the permit, mechanical-sizing, or envelope question that needs an answer.
Share the project location, design or construction stage, and intended milestone. We confirm the inputs and deliverables before the work starts; current drawings can follow through the agreed file handoff.
Common scopes
Part 9.36 energy modelling
- modelling and documentation for the selected energy-code pathway
- review of supplied drawings, specifications, and design assumptions
- a record of inputs and open items for the submission team
See Code Compliance Support. The authority having jurisdiction confirms permit expectations and acceptance.
F280 heating and cooling loads
- review of building geometry, assemblies, windows, and design conditions
- load calculations for the agreed building boundary
- an assumptions and information-gap summary for equipment-sizing discussions
See CSA F280 Heat Loss and Peak Load. Equipment selection and final system design remain with the responsible professional or trade.
Mid-construction inspections
- air barrier continuity risks
- insulation alignment and transitions
- leakage details at common trade handoffs
See Envelope Mid-Construction Inspections and the mid-construction checks guide.
Airtightness planning and testing
- early target setting
- diagnostic testing where appropriate
- follow-up strategy when results miss target
Start with Airtightness Testing when measurement or diagnostic context is the next requirement.
Modelling and pathway comparisons
- envelope and mechanical tradeoffs
- window and shading decisions
- parametric options for comfort, cost, and energy goals
Review Energy Modelling and Upgrade Pathways or the code pathway guide.
Compliance and label support
- documentation support for the selected pathway
- readiness work for EnerGuide, ENERGY STAR, and Built Green workflows
- clear assumptions for the file
Use the label-readiness checklist to identify documentation hold points.
When to engage
- Planning: confirm the scope before details get locked in
- Construction: catch continuity issues before finishes
- Closeout: make sure the paperwork matches the building
Request a quote if you want a practical scope rather than a broad package.